It's a given that you'll always need management on a job site, but VerdeSol along with Coastal Solar (our teaming partner) is taking it one step further when it comes to wire management on a 500+kW system in South Carolina.

With this solar PV installation, we're not only figuring out where to run 20,000 ft of array wire, but we're making sure all of it, including the panel wires, are kept safe and out of sight.

AFTER Wire Management BEFORE Wire Management

So before the stair tower comes down, put your safety vest and hard hat on and walk the rows between your newly installed solar arrays to check for the following...

  • All wires exposed to the elements are inside a loom or pipe

  • No wires are touching the roof membrane

...then rest assured the energy we spent will convert to more energy production for your business!